PRESS RELEASE
PROJECT LAUNCH
Implementing an energy consumption monitoring system
(electricity, thermal energy, compressed air)
at the SC Sortilemn SA level
Reference number: SMIS 2014+ 105740
Date of publication of the announcement: January 20, 2018
SC SORTILEMN SA, with headquarters in Gherla, Str. Cluj no. 7, Cluj County, announces the signing of the financing contract on the 21st of December 2017, concluded with the Ministry of Regional Development, Public Administration and European Funds in the capacity of the Management Authority for the Large Infrastructure Operational Program.
The project entitled “Implementation of a consumption monitoring system energy (electricity, thermal energy, compressed air) at SC level Sortilemn SA” is to be implemented by September the 30th, 2018 in Gherla, Str. Cluj no. 7, Cluj County. The total value of the project is 1,163,388.02 lei, of which the amount of non-refundable financing is 889,500 lei.
The general objective of the project is to increase the energy efficiency of the SC company Sortilemn SA by reducing both existing and future energy consumption, as a result of the implementation of a high-performance system for monitoring them.
Contact: Alina Lazăr, tel. 0756 205 518, fax: 0264 243 148, e-mail: af@sortilemn.ro
Project co-financed from the European Regional Development Fund through the Large Infrastructure Operational Program.
“The content of this material does not necessarily represent the official position of the Union European Union or the Government of Romania”.