NOTICE OF INTENT

 

 

Issued:

Buyer: SC SORTILEMN SA

 

SC SORTILEMN SA

– Notice of intent

High efficiency biomass cogeneration plant project – Participation invitation

NOTICE OF INTENT

 

 

The SC SORTILEMN SA company has requested the co-financing of the project described below through non-reimbursable funds, within the Sectoral Operational Program “Increasing Economic Competitiveness” (SOPIEC) – in which investment projects from the sector can be co-financed from public funds (ERDF and state budget) energy, for the 2008-2013 period. Within this program, 5 priority axes are defined.

The implementation of Axis Priority 4 “Increasing energy efficiency and security of supply in the context of combating climate change” within the SOPIEC rests with the Intermediate Body for Energy (IBE) within the General Directorate of Energy, Oil and Gas of the Ministry of Economy, Trade and Business Environment (METBM).

Through the address of the Intermediate Body for Energy (IBE) no. 147798 / 30.09.2010, SC SORTILEMN SA received confirmation that the submitted project meets the specific eligibility conditions requested and as a result the applicant can start the works related to the project.

Under these conditions SC SORTILEMN SA publishes the following Notice of Intent.

The purchase of related goods and services for the

 “HIGH EFFICIENCY BIOMASS COGENERATION PLANT”

Design and execution of electrical installations

PROGRAM

 

Sectoral Operational Program Increasing Economic Competitiveness (SOPIEC)
Priority Axis 4
  • Increasing energy efficiency and security of supply in the context of combating climate change.
Major Area of Intervention 1 (MAI 1)
  • Efficient and sustainable energy (improvement of the energy efficiency and the sustainable development of the energy system from an environmental point of view).
Operation A 
  • Supporting investments in installations and equipment for industrial enterprises, which will lead to energy savings, in order to improve energy efficiency.

 

THE CONTRACTING AUTHORITY

Name, address and contact point:
  • SC SORTILEMN SA commercial company, Gherla city, Clujului street no. 7, Cluj County, postal code 405300, Romania
  • Contact point: Gherla city, Clujului street no. 7, Cluj county, postal code 405300, Romania.
    Phone: 004.0264.241.717, fax: 004.0264.243.148.
  • Person to contact: Mr. Marius Caprar, Mrs. Lazar Alina
    Internet address: www.sortilemn.ro
Type of contracting authority and main activity: 
  • Commercial company based on shares with private capital.
  • Main activity: Furniture manufacturing

 

SUBJECT OF THE CONTRACT

The project: The “High-Efficiency Biomass Cogeneration Plant” (HEBCP) project consists in the installation and commissioning of a boiler with thermal oil based on biomass and an ORC (organic Rankine Cycle) turbogenerator together with all the additional services and equipment necessary for automatic operation, in order to simultaneously produce heat (respectively 5,400 KW hot water at 95/75 degrees C and 1,200 KW superheated water at 150/125 degrees C) and electricity.
Name of the contracts, short description and technical specifications required for preparing the offer: Within this procurement procedure, the following is pursued:

1. Preparation of the necessary documentation to update the Technical Connection Notice.

2. Design, realization and commissioning: “Installation of turbogenerator connection to the electrical network”.

3. Realization: “Electrical installations related to Boiler”.

(Electrical connection installations between the electrical panel of the boiler and the auxiliary equipment, devices/instruments attached to the boiler).

4. Realization: “Electrical installations related to the Turbogenerator”.

(Electrical connection installations between the electrical panel of the turbogenerator and auxiliary equipment, devices, instruments related to the turbogenerator),

5. Realization: “Safety power supply installation”

6. Design and realization: “Electrical installations (normal and safety lighting installations, as well as electrical power installations) and related telecommunications Buildings-Administrative Building, Turbogenerator Room, Boiler Room, Biomass Storage, Supply Roof”.

7. Realization: “Turbogenerator Hall ventilation installations”.

Type of contract: Purchase of related goods and services
CPV Code: CPV code:

71323100-9 Design services of electrical energy systems,

316: Electrical equipment,

317: Electronic, electromechanical and electrotechnical accessories,

3241: Local network,

3242: Network equipment.

42512520-0: Ventilation channels.

Location of equipment delivery and installation SC SORTILEMN SA, Gherla city, Clujului street no. 7, Cluj County, Code 405300, Romania.

Phone: 0264-241717; fax: 0264-243148/992

Contract duration: Deadline: 31.05.2012

  • Work guarantee period: at least 24 months from the commissioning date of the High Efficiency Biomass Cogeneration Plant.

 

PROCUREMENT PROCEDURE

 

Type of procedure: Limited request for offers.

The purchase is made under the conditions of the specific procedure in the Financing Contract, established by internal rules, Annex 6 – Purchase instructions for private economic operator beneficiaries of the Sectoral Operational Program “Increasing Economic Competitiveness” published at http://oie.minind.ro/ – Financing contract for private operators – model.

Specific details can be found at the following URL: http://oie.minind.ro/ , Financing contract for private operators (page 7, paragraph d) “Purchases” and page 42 “Annex 6 – Internal Procurement Rules”)

This procedure does not come under the incidence of national and/or community legislation on public procurement and was developed to guarantee a competitive environment in the process of awarding procurement contracts co-financed from these funds.

This procedure is mandatory for the beneficiaries of POS CCE who do not fall under the provisions of GEO 34/2006 with subsequent amendments and additions.

Attribution criteria: In order to evaluate the offers, the following methodology will be used:

1.      Offer price – 60 points

The score for the evaluation factor “Offer price” is awarded as follows:

a) For the lowest among the prices of the offers, the maximum score is awarded.

b) For a price other than that stipulated in the literature a) the score is awarded as follows:

P(n)=[minimum price/price(n)] x the maximum score allocated

2. Duration of the guarantee of good execution of the work – 10 points

a) For the longest duration of the granted guarantee, the maximum score assigned to the evaluation factor is given, i.e. 10 points

b) For other warranty periods, the points awarded are weighted as follows:

Gn=[Warranty duration offered(n)/Maximum warranty duration offered] x maximum score allocated.

c) The duration of the minimum accepted good performance guarantee is 24 months and is rated with 0 points. For the duration of the good performance guarantee offered under 24 months, the offers are rejected.

3. Warranty period for equipment – ​​10 points

a) For the longest duration of the warranty granted for equipment, the maximum score assigned to the evaluation factor is given, respectively 10 points.

b) For other warranty periods granted to equipment, the points awarded are weighted as follows:

Gn=[Warranty duration offered(n)/Maximum warranty duration offered] x maximum score allocated.

c) The minimum accepted warranty period for equipment is 24 from commissioning.

For warranty periods for equipment offered under 24 months from commissioning, offers are rejected.

4. Duration of execution – 10 points

5. Technical criteria – 10 points

a) Quality Assurance Program: 1 point.

b) Environmental Management Plan: 1 point.

c) Occupational Health and Safety Management Plan: 1 point.

d) Technical characteristics of the equipment: 7 points.

The deadline for submitting offers December 5th, 2011, 12:00 p.m., SC SORTILEMN SA headquarters
The language or languages ​​in which the offer or request for participation can be written: Romanian
The minimum period during for which the bidder had to maintain his offer: The period of validity of the offer will be 90 days from the deadline for submission of offers, established by the Buyer.
The method of providing the award documentation: Electronic mail or paper support

 

LEGAL AND FINANCIAL INFORMATION

 

The contract is part of a project/program financed from community funds: Yes
The execution of the contract is subject to other special conditions: Yes, respectively to the specific legislation governing the use of European structural funds (http://oie.minind.ro/ )
Information regarding the framework of general regulations: European funds legislation: http://oie.minind.ro/

Fiscal legislation: www.mfinante.ro

Legislation in the field of environmental protection: www.mediu.ro

Labor protection and working conditions: www.mmuncii.ro

Competent body for mediation procedures: In accordance with the Romanian legislation
The main methods of financing and payment and/or referral to the relevant provisions: Financing is provided from the following sources:

  • European Structural Funds,
  • Energy Efficiency Fund,
  • Commercial Credit,
  • Own Sources.

Legal representative,

Ghisa Ludovic