Press release – Notice of intent – Design and execution of Industrial Constructions

10/11

SC SORTILEMN SA

 

BIOMASS COGENERATION PLANT PROJECT

 

Design and execution of INDUSTRIAL CONSTRUCTIONS

 

NOTICE OF INTENT

 

Buyer: SC SORTILEMN SA

 

SC SORTILEMN SA

“Cogeneration plant with biomass function” project – Notice of intent

NOTICE OF INTENT

 

The SC SORTILEMN SA company has requested the co-financing of the project described below through non-reimbursable funds, within the Sectoral Operational Program “Increasing Economic Competitiveness” (SOPIEC) – in which investment projects from the sector can be co-financed from public funds (ERDF and state budget) energy, for the 2008-2013 period. Within this program, 5 priority axes are defined.

The implementation of Axis Priority 4 “Increasing energy efficiency and security of supply in the context of combating climate change” within the SOPIEC rests with the Intermediate Body for Energy (IBE) within the General Directorate of Energy, Oil and Gas of the Ministry of Economy, Trade and Business Environment (METBM).

Through the address of the Intermediate Body for Energy (IBE) no. 147798 / 30.09.2010, SC SORTILEMN SA received confirmation that the submitted project meets the specific eligibility conditions requested and as a result the applicant can start the works related to the project.

Under these conditions SC SORTILEMN SA publishes the following Notice of Intent.

Design and execution of INDUSTRIAL CONSTRUCTIONS, for the “HIGH EFFICIENCY BIOMASS COGENERATION PLANT”

 

PROGRAM 

Sectoral Operational Program Increasing Economic Competitiveness (SOPIEC)
Priority Axis 4
  • Increasing energy efficiency and security of supply in the context of combating climate change.
Major Area of Intervention 1 (MAI 1)
  • Efficient and sustainable energy (improvement of the energy efficiency and the sustainable development of the energy system from an environmental point of view).
Operation A 
  • Supporting investments in installations and equipment for industrial enterprises, which will lead to energy savings, in order to improve energy efficiency.

 

THE CONTRACTING AUTHORITY

Name, address and contact point:
  • SC SORTILEMN SA commercial company, Gherla city, Clujului street no. 7, Cluj County, postal code 405300, Romania
  • Contact point: Gherla city, Clujului street no. 7, Cluj county, postal code 405300, Romania.
    Phone: 004.0264.241.717, fax: 004.0264.243.148.
  • Person to contact: Mr. Marius Caprar, Mrs. Lazar Alina

Internet address: www.sortilemn.ro

Type of contracting authority and main activity:  Commercial company based on shares with private capital. Main activity: Furniture manufacturing

 

SUBJECT OF THE CONTRACT

The project: Design and execution of INDUSTRIAL BUILDINGS for a HIGH EFFICIENCY BIOMASS COGENERATION PLANT
Name of the contracts: In this procurement procedure, the following is pursued:

  1. Industrial construction design for the Boiler Room, Turbogenerator Room, Administrative building (control room with changing room and bathroom, office with bathroom and kitchen), Feeder roof with wood chips, Wood chip warehouse, including obtaining approvals, authorizations
  2. Land planning
  3. Execution of industrial construction foundations according to design
  4. Execution of the equipment foundation according to the plans of the equipment manufacturer
  5. Execution of industrial constructions according to design
  6. Completion of the constructions after the installation of the equipment on the foundation
Type of contract: Design and execution of Industrial Construction Cogeneration Plant
CPV Code: CPV Code: 45213200-5 Warehouse and industrial building construction works
Construction location: SC SORTILEMN SA, Gherla city, Clujului street no. 7, Cluj County, Code 405300, Romania.

Phone: 0264-241717; fax: 0264-243148/992

Contact person: Caprar Marius, Lazar Alina

Contract duration: Schedule for completion:

  • Design and execution 4 months from the date of signing the contract
  • Completion of construction after mounting the equipment on the foundations – one week

 

PROCUREMENT PROCEDURE

Type of procedure: Restricted request for offers.

The purchase is made under the conditions of the specific procedure in the Financing Contract, established by internal rules, Annex 6 – Purchase instructions for private economic operator beneficiaries of the Sectoral Operational Program “Increasing Economic Competitiveness” published at http://oie.minind.ro/  – Financing contract for private operators – model.

This procedure does not come under the incidence of national and/or community legislation on public procurement and was developed to guarantee a competitive environment in the process of awarding procurement contracts co-financed from these funds.

This procedure is mandatory for CCE POS beneficiaries who do not fall under the provisions of GEO 34/2006 with subsequent amendments and additions.

Attribution criteria: In order to evaluate the offers, the following methodology will be used:

  • The lowest price in compliance with the requirements of the bidding documentation

The buyer will award the contract to the bidder whose bid:

  • Was determined to be substantially adequate to the Bidding Documentation, and
  • Was ranked first according to the evaluation methodology
The language or languages ​​in which the offer or request for participation can be written: Romanian
The minimum period during for which the bidder had to maintain his offer: 90 days

 

LEGAL AND FINANCIAL INFORMATION

The contract is part of a project/program financed from community funds: Yes
The execution of the contract is subject to other special conditions: Yes, respectively to the specific legislation governing the use of European structural funds (http://oie.minind.ro/ )
Information regarding the framework of general regulations: European funds legislation: http://oie.minind.ro/ Fiscal legislation: www.mfinante.ro

Legislation in the field of environmental protection: www.mediu.ro

Labor protection and working conditions: www.mmuncii.ro

Competent body for mediation procedures: In accordance with the Romanian legislation
The main methods of financing and payment and/or referral to the relevant provisions: Financing is provided from the following sources:

  • European Structural Funds,
  • Energy Efficiency Fund,
  • Commercial Credit,
  • Own Sources.

Legal representative,

Ghisa Ludovic