Increasing the energy efficiency of SC Sortilemn SA by reducing existing and future energy consumption.
Project co-financed by the European Regional Development Fund through the Large Infrastructure Operational Program [2014-2020].
Total value of the project: 19.626.329 lei
2010

Co-financed by the European Regional Development Fund, the project ”Biomass-fired cogeneration plant” consisted mainly in the installation and commissioning of a biomass-fired thermal oil boiler, but also an ORC type turbogenerator (Organic Rankine Cycle – Rankine cycle with organic liquids). In addition, all the equipment and auxiliary facilities required for automatic operation have been added.